Step 1: Installing Ground Screws
Anchor the support structure to the ground using specialized drilling equipment. Depth depends on soil type to ensure sufficient weight-bearing capacity.

Step 2: Install the Beams
After the foundation is set, install the beams. Connect the diagonal support poles to the top of the columns using high-strength bolts and nuts.

Step 3: Installing Rails
Attach the rails that support the solar panels to the beams using brackets and bolts. Ensure the rails are perfectly level before proceeding.

Step 4: Installing Solar Panels
Finally, fasten the solar panels to the rails using specialized mounting hardware, ensuring each panel is securely fixed.
| Parameter | Specification Details |
|---|---|
| Material | Structure: Mg-Al-Zn & AL-6005-T5 (Anodized); Components: SUS304 & AI6005-5 |
| Application | Commercial and Residential installation |
| Tilt Angle | 0-60° |
| Wind Speed | 0-60 m/s |
| Snow Load | 0-150cm |
| Ground Clearance | 0-1m |
| Design Standard | AS/NZS 1170, DIN 1055, JIS C8955: 2017, IBC 2009 |
| Warranty | 12 years |




Workshop - Aluminum Material
Independent processing for cutting, drilling, stamping, and forging. Capable of meeting high precision and customization requirements.
Workshop - Steel Material
Equipped with 6 production lines for steel, Magnesium aluminum zinc, and S350GD/S450GD materials. Monthly productivity reaches 40-50MW.












Voila Orthopedic Implants